57117 (DIN70) Battery for UPS / Backup Power: Application Guide

Part of the UPS / Backup Power guide.

The 57117 (DIN70) is a 70 Ah DIN battery in a 273 × 174 × 175 mm (ref.) case — standby duty wants low self-discharge, reliable float life, and enough capacity for the outage window.

Key Takeaways

  • Spec — 70 Ah C20, 600 A (EN) (ref.) CCA, 273 × 174 × 175 mm (ref.), B13 (bottom rail) hold-down, DIN post.
  • Application — ups / backup power.
  • Fit — standby duty wants low self-discharge, reliable float life, and enough capacity for the outage window.
  • Usable capacity — ~35 Ah at 50% DoD for deep-cycling duty.

DIN70 Specifications

ParameterSpecification
Model57117
Also Known AsDIN70
СтандартныйDIN
Capacity (C20)70 Ah
CCA Rating600 A (EN) (ref.)
Dimensions (L×W×H)273 × 174 × 175 mm (ref.)
Terminal TypeDIN post
Hold-DownB13 (bottom rail)

UPS / Backup Power Requirements → DIN70 Match

RequirementDIN70Verdict
Standby capacity (C20)70 Ah✓
Float / standby serviceSealed maintenance-free (Ca-Ca)✓
Self-dischargeLow (sealed Ca-Ca alloy)✓
Voltage12 V✓

Cross-Standard Equivalent

СтандартныйEquivalentConfidenceNote
BCIGroup 48 (H6)MediumSame footprint — verify terminals

Cross-standard matches are dimensional approximations. Always verify tray length, terminal type, and hold-down before substituting.

Fitment Considerations

  • UPS service is float — the battery sits fully charged most of its life, so low self-discharge and sealed design win.
  • Size for the outage window: a 70 Ah battery backs a small load for hours, a server room for minutes.
  • Temperature — keep the battery at 20–25 °C; every 8 °C above roughly halves float life.

What Buyers Should Ask

Before ordering the 57117 Battery — DIN70 for UPS backup, confirm these points with the supplier:

  • CCA standard — 600 A (EN); verify the test method (EN vs SAE) printed on the label matches your region’s convention.
  • Capacity — 70 Ah; enough reserve for the UPS backup accessory load.
  • Case fit — 273 × 174 × 175 mm (industry ref.); measure the tray and confirm the B13 (bottom rail) hold-down.
  • Terminals — Standard DIN post; check polarity and post type against the harness.
  • Data sheet — request the production Certificate of Analysis (CoA) for exact batch values.

Frequently Asked Questions

How long will it back up a load? Runtime = usable Ah ÷ load. For UPS float service, the 70 Ah rating defines the outage window at 50% DoD.

How often to replace a UPS battery? 3–5 years in float service; replace when runtime falls below the required outage window.

What shortens a UPS battery’s life? Heat, deep discharge, and infrequent replacement. Keep it cool and replace on schedule.

Related Articles

Sources & Verification

Specifications sourced from Chengguang Power Tech factory technical documentation and tested to DIN EN 50342-1, SAE J537, and IEC 60095-1. Figures marked “(ref.)” are third-party manufacturer catalog reference values — always confirm against the production data sheet. Every batch ships with a Certificate of Analysis (CoA).

Author: Chengguang Engineering Team · Reviewed: IATF 16949 Quality Department · Last updated: 2026-08-26

Похожие записи

Добавить комментарий

Ваш адрес email не будет опубликован. Обязательные поля помечены *